Protecting America’s Waters

Cost-effective case closures using High-Vacuum Dual-Phase Extraction (HVDPE) and mobile remediation systems.

  • Low-noise systems for 24-hour operations
  • Depths > 270 ft extraction capability
  • Qualified technical expertise & supervision
Discuss your site
Open truck with high-vacuum extraction equipment

What we do

Mobile HVDPE/HVSVE systems and on-site water treatment staged across the U.S. for rapid deployment.

Mobile extraction system operating at a remediation site
Mobile extraction system operating at a remediation site
Project At Yellowstone
Trailer-mounted high-vacuum unit (enclosed)
Trailer-mounted high-vacuum unit (enclosed)
750+
# of Case Closures
53%
Less Carbon Footprint vs Fixed Base Unit
$5
$ / lb. Hydrocarbon Removed

Testimonials

"

Their services have resulted in great success on several projects with which we have been involved. If service, response, and the results are key, CalClean can deliver.

"
Robert B. Hansen, Project Manager
Alta Em, Inc.
"

CalClean was proactive in refining and maximizing the level of contaminant removal with each HVDPE event. They provided a cost cap on ground water treatment for each HVDPE event, which provided an overall cost savings of approximately $300,000. We would highly endorse their technology.

"
Eric A. Smith, Principal Hydrogeologist
Waterstone Environmental
"

As you know, you conducted two events at the site and the results were a reduction of over 90% for all compounds in groundwater. The results were so good, that the regional board did not even require verification soil borings. We would not have been able to get this closure without you, your crews, and your equipment.

"
Mike Barminski, Project Manager
CapRock Environmental Geology and Engineering
"

In large part because of CalClean's efforts, we now have hope that we will see closure of our site in the near future. Mammoth Mountain Ski Area whole heartedly endorses CalClean and their HVDPE technology. Bottom line, if you want results, use CalClean.

"
Tom Hodges, Director of Planning
Mammoth Mountain Ski Area
"

The services provided by CalClean were completed efficiently, effectively, and professionally. We would not hesitate in recommending CalClean for other soil and groundwater remediation projects.

"
Joseph P. Schaaf, Senior Geologist
Padre Associates, Inc.
"

Excellent job overall, and we appreciate the project team's attention to health and safety.

"
Loren Kaehn, HES Field Representative
MBU, Chevron Environmental Management Company
"

I believe that their mobile proprietary HVDPE technology is a very unobtrusive way of providing huge amounts of contaminant removal in very difficult situations, such as ours, over short periods of time with little onsite interference.

"
Gerald Bodamer, Sec/Treasurer
Barstow Properties, Inc.
"

CalClean has really stepped up to the plate to stay current with your requirements. Having a vendor that understands their equipment and our expectations really helps the success of these projects.

"
Erik Lawson, Senior Engineer
Stantec Consulting Services, Inc.
"

Since your contribution was crucial in moving this site toward closure, I would like to thank you very much for the excellent job done. We will continue to work with you on other sites, and I am confident that together we will accelerate the closure process.

"
Chris Panaltescu, General Manager
Thrifty Oil Company/Golden West Refining Company
"

In the two projects we have used CalClean, I have always found your equipment to perform as advertised, is 100% reliable and your onsite technicians are highly qualified professionals. The peace of mind knowing CalClean is on the job is one of those priceless intangibles that is a key to a successful project.

"
Howard E. Whitney, PG, Remediation
Testing and Design, Inc.

Ready to submit your proposal request?

SUBMIT PROPOSAL REQUEST